Details
High-performance 1200 bph PET gallon filling line engineered for 15L and 19L water bottles.
Integrated rinsing, filling, capping, and sealing monoblock ensures fast and hygienic operation.
Designed and manufactured in Türkiye by Güçlü Makine Ltd., under the AquaLine Units brand.
⚙️ Detailed Description
🔹 Technical Overview
| Specification | Details |
|---|---|
| Capacity | 1200 bottles/hour (19L reference) |
| Bottle Type | PET Gallon (15L / 19L) |
| Automation | PLC + HMI Control |
| Material | AISI 304 / 316 Stainless Steel |
| Power Supply | 380V / 50Hz |
| Air Pressure | 6–8 bar (dry, oil-free) |
| Certifications | CE Compliant |
| Warranty | 1 Year (manufacturing defects) |
| Origin | Made in Türkiye |
🔹 Main Components & Prices
| Component | Description | Price (€) |
|---|---|---|
| Rinsing–Filling–Capping–Sealing Monoblock | Combined high-speed unit for rinsing, filling & sealing | 130,000 |
| Heat Tunnel | Shrink band sealing | 2,500 |
| Conveyor Line (30m) | Heavy-duty stainless steel conveyor system | 30,000 |
| Installation & Commissioning | On-site setup & operator training | 5,000 |
💶 Total Line Price:
€167,500 (EXW Istanbul)
(Optional equipment not included)
🔹 Optional Equipment
| Option | Description | Price (€) |
|---|---|---|
| Date Printer | Inkjet date/batch printing | 7,500 |
| Labeling Machine | Automatic label application | 9,000 |
| PET Blowing Machine | Preform blowing & shaping system | 150,000 |
🔹 Delivery & Service
-
Delivery Term: EXW Istanbul
-
Packaging: Foam padding + wooden crate + stretch wrap
-
Installation: Global setup & operator training available
-
Lead Time: 8–10 weeks after order confirmation
-
After-Sales Support: Remote video diagnostics & on-site maintenance
-
Warranty: 1 Year (optionally extendable)
🔹 Contact for Quotation
📞 Request a Quotation: Contact Form
💬 WhatsApp Direct: https://wa.me/905322249198
📧 Email: aqualineunits@gmail.com
AquaLine engineers customize PET filling systems to fit your production layout and market demand.
🔹 Shipping & Delivery
All AquaLine Units systems are shipped under EXW Istanbul (Ex-Works) terms.
Packaging includes foam padding, wooden crate, and stretch wrap for maximum protection during transport.
We assist clients with international logistics, customs documentation, and optional insurance via DHL, FedEx, or sea freight.
Delivery time: 10–12 weeks after confirmed down payment.
🏭 Local pickup and global delivery options available.
.🔹 Returns & Refund Policy
Each system is custom-built and project-specific.
Therefore, returns, refunds, and cancellations are not accepted after production has started.
🔹 Materials & Construction
All parts in contact with water are made of AISI 304 or 316 stainless steel.
Non-contact frames and covers are aluminum or galvanized steel with anti-corrosion coating.
Hoses and fittings are food-grade and BPA-free.
Electrical systems use PLC + HMI automation with CE safety standards.
🔧 Designed for long-term industrial operation and hygienic production.
🔹 Care & Maintenance
Routine maintenance is required to ensure continuous operation:
CIP (Cleaning-in-Place) recommended weekly
Lubricate mechanical moving parts monthly
Inspect filters and water lines every 3 months
Replace seals & gaskets annually
Service and spare parts support are available worldwide.
🧰 Preventive maintenance contracts available upon request.
🔹 Warranty & Support
Each line is covered by a 1-year manufacturer’s warranty against production defects.
On-site installation, commissioning, and operator training are provided by Güçlü Makine technicians.
Remote technical assistance via WhatsApp or video call is available.
Optional long-term maintenance contracts can be arranged.
📞 For service inquiries: +90 532 224 91 98 | aqualineunits@gmail.com
🔹 Safety & Compliance
CE certified manufacturing
Emergency stop buttons on all main units
Transparent protection covers on high-speed areas
Electrical compliance: EN 60204-1
Food contact materials meet EU and FDA standards
⚠️ Operator training is mandatory before running the system.
.🔹 Installation & Commissioning
Our technical team provides full setup and operator training on-site.
Installation time depends on line capacity and factory layout (average 3–5 days).
A complete FAT (Factory Acceptance Test) is done before shipment,
and a SAT (Site Acceptance Test) after installation.
🚀 Turnkey commissioning service available worldwide.
You might also like...
Shop by collection
Polycarbonate Gallon Filling Lines
PET Gallon Filling Lines
Glass Gallon Filling Lines
Polycarbonate & Glass Gallon Filling Lines (Hybrid Systems)
Optional Equipment